PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Fireproofing the 4th floor Facing South.jpg Installing the RTU at the lower Roof Facing West.jpg Continued installing the handset stone panels at the South Elevation.jpg Fireproofing the high roof metal decking Facing North.jpg Installaing weather strips at the Monumental Stairs Curtain Wall Facing South.jpg Installing roof drains at the Sally ports canopy Facing South.jpg Installing Sheathing around the parapet Facing South.jpg
Previous pageNext page Continued installing the handset stone panels at the South Elevation
Continued installing the handset stone panels at the South Elevation